1. Before installation of a power shaft check a condition of a sealing ring of a power shaft in the transmission. |
2. Clear vents for a power shaft in a nave and the transmission. Grease with a thin layer of lubricant working edges of a sealing ring, a vent of a power shaft and flanges. |
Left power shaft |
3. Establish a power shaft in differential, having combined vents of a power shaft with flutes of semi-axial gear wheels of differential. Insert a power shaft into the transmission against the stop. |
4. Establish the external end of a power shaft in a nave. |
5. Establish a protective plate to the lower spherical hinged connection, then connect the lower hinged connection with the lever. |
|
6. Establish a new nut of fastening of hinged connection and tighten it the required moment. Grease inside and a carving of a nut of fastening of a power shaft with pure engine oil, screw it on a power shaft and tighten the required moment. Check that the nave rotates freely then establish a blocking washer. |
|
7. Record a blocking washer the spring forelock. |
8. Install the ABS sensor. |
9. Establish a wheel, then lower the car on the earth and finally tighten bolts the required moment. |
10. Check oil level in the transmission and if necessary add. |
Right power shaft |
11. Check that the intermediate bearing rotates easily and evenly. Make sure that there is no side play of an external ring in relation to internal. |
12. Grease with a thin layer of lubricant an external ring of the intermediate bearing and an internal ledge for a dustproof cover. |
|
13. Insert the internal end of a shaft through a suspension bracket of installation of the intermediate bearing and establish a dustproof cover on a power shaft. |
14. Combine internal vents of a power shaft with grooves of a semi-axial gear wheel of differential, and the intermediate bearing with an installation suspension bracket. Insert a power shaft against the stop into the transmission. |
|
15. Install the external hinge of equal angular speeds in a nave. |
|
16. Check correctness of installation of the intermediate bearing, then turn bolts on 90 ° and enshrine them in this provision by nuts. Close the intermediate bearing a dustproof cover. |
17. Establish a protective plate to the lower spherical hinged connection, then connect the lower hinged connection with the lever. |
18. Establish a new nut of fastening of hinged connection and tighten it the required moment. Grease inside and a carving of a nut of fastening of a power shaft with pure engine oil, screw it on a power shaft and tighten the required moment. Check that the nave rotates freely then establish a blocking washer and record it the spring forelock. |
19. Install the ABS sensor. |
20. Establish a wheel, then lower the car on the earth and finally tighten bolts the required moment. |
21. Check oil level in the transmission and if necessary add. |